gqf橋梁伸縮縫中的橡膠密封帶的設備為便利設置模板及砼澆注狀況的查看,故建議當砼抵達50%以上強度時,再根除塞在型鋼中心的隔絕物,然后裝入橡膠密封帶。將橡膠密封帶伸翻開,然后平順到型鋼縫隙中,再利用撬杠撥動橡膠密封帶頂部使之嵌入型鋼的凹槽中就可以了。
In order to facilitate the setting of formwork and the inspection of concrete pouring condition, it is suggested that when the concrete reaches more than 50% strength, the insulation plug in the center of section steel should be removed, and then the rubber sealing belt should be installed. Open the rubber sealing belt, and then smooth into the gap of the section steel, and then use the crowbar to move the top of the rubber sealing belt to make it embedded in the groove of the section steel.
必要時可涂改少數肥皂水以利嵌入,在gqf橋梁伸縮縫上設備橡膠止水帶:砼澆筑振實后,設備橡膠帶、不銹鋼板,伸縮縫板略高于路面1-2mm,將板體壓實,不呈現空位,待強度抵達80%后,緊固螺栓。當伸縮縫設備完畢,持續攝生,攝生期不少于一個星期的時間。
砼振搗密實后,用抹板搓出水泥漿,分4-5次按慣例抹壓平整連續。這道工序應特別注意平整度,砼面比瀝青路面的頂面略低28-29mm為宜,過高或過低都會構成跳車現象。水泥砼澆筑完成后,然后掩蓋麻袋或草苫子,嚴峻灑水攝生,攝生期不少于7天。攝生期間禁止車輛通行。
所以就需求鋼筋的質量達準,一同整個焊接的過程中,要滿足的牢固,只有抵達這些才調實在的的契合gqf橋梁伸縮縫的施工要求。澆注前應在縫兩頭鋪上塑料布,確保砼不污染路面。 砼振搗時應兩頭一同進行,為確保砼密實,用振搗棒振至不再有氣泡連續。
若組合式伸縮設備過長受運送長度捆綁或其他其他原因時,在工廠試拼裝后,可以分段拼裝運送,但模數式伸縮設備需在工廠拼裝。用于該分項工程的gqf橋梁伸縮縫材料均按方案進場,伸縮設備運到工地寄存時均墊設高度距地上至少30cm并用彩條布籠蓋好,確保其不受損壞開工的要求也起到切開后的橋面來進行聯接的作用。http://www.ivew.cn/